Temporary Building Case Studies

Aganto temporary buildings help businesses remain responsive, flexible and competitive. Our customers have used buildings short term during periods of growth and improvement or long-term as an alternative to a more traditional building. Click on the links below to find out how.

With a portfolio encompassing some of the UK’s best loved and iconic soft drink brands, Britvic’s Head Office in Hemel Hempstead is the centre point to many offices and factories across the world where the brands are ...

[Details...]

Posted in Warehousing

Truckwright needed a temporary building for Trans Shipping and Loading, knowing that an additional warehouse to house 26 tonne articulated trucks was vital for the company’s expansion strategy.

[Details...]

Posted in Warehousing

temporary buildings

Hiring a temporary storage building from Aganto is the perfect way to evaluate a new system. Quickly installed, with minimum hassle and requiring minimal upfront investment.

[Details...]

Posted in Storage Buildings

temporary warehouse

Rather than take on a new facility, Mini Clipper looked at using a temporary warehouse structure on their existing land as a more effective option.

[Details...]

Posted in Warehousing

temporary storage

Doncasters Paralloy needed a high quality, building solution to aid their expansion. Aganto created a bespoke solution with 4 temporary buildings, for long term use. Find out more here…

[Details...]

Posted in Storage Buildings

temporary extension

Following their relocation to Ealing, the London Broncos needed a new gym building, fast. Aganto’s insulated prefab building was just what they needed.

[Details...]

Posted in Educational buildings

prefabricated building

Following a devastating fire at one of their depots, space to store linen became a major priority for Express Linen. Aganto temporary buildings to the rescue! Find out more…

[Details...]

Posted in Storage Buildings

prefabricated warehouse

Dormex Containers needed more space - fast. Aganto supplied a juniper green temporary storage structure to blend into the beautiful surroundings and which will last for years.

[Details...]

Posted in Storage Buildings

prefabricated storage

Following a serious warehouse fire, Grantham Manufacturing needed a new building – fast. Aganto Sales Manager, Janos Szabo came to the rescue.

[Details...]

Posted in Warehousing

steel buildings

With an increasing fleet of truck mixers, Wiltshire needed to look at extending their vehicle workshop and reducing time spent travelling between sites.

[Details...]

Posted in Workshop Buildings

For advice and information call Aganto on 0808 231 8878 Or arrange a Site Visit